Report Summary

  • 47

    Performance

    Renders faster than
    65% of other websites

  • 87

    Accessibility

    Visual factors better than
    that of 66% of websites

  • 58

    Best Practices

    More advanced features
    available than in
    20% of websites

  • 90

    SEO

    Google-friendlier than
    68% of websites

tuition.in

Best Tutors & Coaching Centers in India | Home Tuition | Online Classes - Tuition.in

Page Load Speed

6.1 sec in total

First Response

1.1 sec

Resources Loaded

4.4 sec

Page Rendered

559 ms

About Website

Visit tuition.in now to see the best up-to-date Tuition content for India and also check out these interesting facts you probably never knew about tuition.in

Find verified tutors & coaching centers for CBSE, ICSE, JEE, NEET preparation. Compare fees, read reviews, book free demo classes. 10,000+ tutors across India.

Visit tuition.in

Key Findings

We analyzed Tuition.in page load time and found that the first response time was 1.1 sec and then it took 5 sec to load all DOM resources and completely render a web page. This is a poor result, as 75% of websites can load faster.

Performance Metrics

tuition.in performance score

47

Measured Metrics

name

value

score

weighting

FCP (First Contentful Paint)

Value5.5 s

6/100

10%

LCP (Largest Contentful Paint)

Value13.2 s

0/100

25%

SI (Speed Index)

Value8.3 s

19/100

10%

TBT (Total Blocking Time)

Value170 ms

93/100

30%

CLS (Cumulative Layout Shift)

Value0

100/100

15%

TTI (Time to Interactive)

Value12.2 s

15/100

10%

Network Requests Diagram

tuition.in

1104 ms

base.css

436 ms

layerslider.css

654 ms

tabs.css

457 ms

modernizr.js

955 ms

Our browser made a total of 60 requests to load all elements on the main page. We found that 95% of them (57 requests) were addressed to the original Tuition.in, 3% (2 requests) were made to Google-analytics.com and 2% (1 request) were made to Googletagmanager.com. The less responsive or slowest element that took the longest time to load (1.8 sec) belongs to the original domain Tuition.in.

Page Optimization Overview & Recommendations

Page size can be reduced by 622.7 kB (22%)

Content Size

2.8 MB

After Optimization

2.2 MB

In fact, the total size of Tuition.in main page is 2.8 MB. This result falls beyond the top 1M of websites and identifies a large and not optimized web page that may take ages to load. 45% of websites need less resources to load. Images take 2.1 MB which makes up the majority of the site volume.

HTML Optimization

-88%

Potential reduce by 54.2 kB

  • Original 61.5 kB
  • After minification 35.8 kB
  • After compression 7.3 kB

HTML content can be minified and compressed by a website’s server. The most efficient way is to compress content using GZIP which reduces data amount travelling through the network between server and browser. This page needs HTML code to be minified as it can gain 25.7 kB, which is 42% of the original size. It is highly recommended that content of this web page should be compressed using GZIP, as it can save up to 54.2 kB or 88% of the original size.

Image Optimization

-1%

Potential reduce by 30.7 kB

  • Original 2.1 MB
  • After minification 2.1 MB

Image size optimization can help to speed up a website loading time. The chart above shows the difference between the size before and after optimization. Tuition images are well optimized though.

JavaScript Optimization

-71%

Potential reduce by 204.8 kB

  • Original 288.3 kB
  • After minification 246.5 kB
  • After compression 83.5 kB

It’s better to minify JavaScript in order to improve website performance. The diagram shows the current total size of all JavaScript files against the prospective JavaScript size after its minification and compression. It is highly recommended that all JavaScript files should be compressed and minified as it can save up to 204.8 kB or 71% of the original size.

CSS Optimization

-85%

Potential reduce by 333.1 kB

  • Original 393.4 kB
  • After minification 368.2 kB
  • After compression 60.3 kB

CSS files minification is very important to reduce a web page rendering time. The faster CSS files can load, the earlier a page can be rendered. Tuition.in needs all CSS files to be minified and compressed as it can save up to 333.1 kB or 85% of the original size.

Requests Breakdown

Number of requests can be reduced by 23 (43%)

Requests Now

54

After Optimization

31

The browser has sent 54 CSS, Javascripts, AJAX and image requests in order to completely render the main page of Tuition. We recommend that multiple CSS and JavaScript files should be merged into one by each type, as it can help reduce assets requests from 10 to 1 for JavaScripts and from 15 to 1 for CSS and as a result speed up the page load time.

Accessibility Review

tuition.in accessibility score

87

Accessibility Issues

Contrast

These are opportunities to improve the legibility of your content.

Impact

Issue

High

Background and foreground colors do not have a sufficient contrast ratio.

Internationalization and localization

These are opportunities to improve the interpretation of your content by users in different locales.

Impact

Issue

High

<html> element does not have a [lang] attribute

Names and labels

These are opportunities to improve the semantics of the controls in your application. This may enhance the experience for users of assistive technology, like a screen reader.

Impact

Issue

High

Links do not have a discernible name

Tables and lists

These are opportunities to improve the experience of reading tabular or list data using assistive technology, like a screen reader.

Impact

Issue

High

Lists do not contain only <li> elements and script supporting elements (<script> and <template>).

Best Practices

tuition.in best practices score

58

Areas of Improvement

Trust and Safety

Impact

Issue

High

Does not use HTTPS

High

Includes front-end JavaScript libraries with known security vulnerabilities

Low

Ensure CSP is effective against XSS attacks

User Experience

Impact

Issue

High

Displays images with incorrect aspect ratio

High

Serves images with low resolution

General

Impact

Issue

Low

Detected JavaScript libraries

High

Browser errors were logged to the console

SEO Factors

tuition.in SEO score

90

Search Engine Optimization Advices

Crawling and Indexing

To appear in search results, crawlers need access to your app.

Impact

Issue

High

Links are not crawlable

Mobile Friendly

Make sure your pages are mobile friendly so users don’t have to pinch or zoom in order to read the content pages. [Learn more](https://developers.google.com/search/mobile-sites/).

Impact

Issue

High

Document uses legible font sizes

High

Tap targets are not sized appropriately

Language and Encoding

  • Language Detected

    EN

  • Language Claimed

    N/A

  • Encoding

    UTF-8

Language claimed in HTML meta tag should match the language actually used on the web page. Otherwise Tuition.in can be misinterpreted by Google and other search engines. Our service has detected that English is used on the page, and neither this language nor any other was claimed in <html> or <meta> tags. Our system also found out that Tuition.in main page’s claimed encoding is utf-8. Use of this encoding format is the best practice as the main page visitors from all over the world won’t have any issues with symbol transcription.

Social Sharing Optimization

Open Graph description is not detected on the main page of Tuition. Lack of Open Graph description can be counter-productive for their social media presence, as such a description allows converting a website homepage (or other pages) into good-looking, rich and well-structured posts, when it is being shared on Facebook and other social media. For example, adding the following code snippet into HTML <head> tag will help to represent this web page correctly in social networks: