Report Summary

  • 70

    Performance

    Renders faster than
    81% of other websites

  • 70

    Accessibility

    Visual factors better than
    that of 35% of websites

  • 83

    Best Practices

    More advanced features
    available than in
    55% of websites

  • 98

    SEO

    Google-friendlier than
    92% of websites

domaza.ae

العقارات في الإمارات العربية المتحدة | العقارات في الخارج | Domaza.ae

Page Load Speed

2.8 sec in total

First Response

363 ms

Resources Loaded

2.3 sec

Page Rendered

169 ms

domaza.ae screenshot

About Website

Visit domaza.ae now to see the best up-to-date Domaza content for Kuwait and also check out these interesting facts you probably never knew about domaza.ae

الامارات العربية المتحدة و العقارات الخارجية . ستجد افضل الاسعار للبيع و الايجار من وكلاء العقارات, و شركات الانشاء, و البائعين - Domaza.ae.

Visit domaza.ae

Key Findings

We analyzed Domaza.ae page load time and found that the first response time was 363 ms and then it took 2.5 sec to load all DOM resources and completely render a web page. This is a poor result, as 50% of websites can load faster.

Performance Metrics

domaza.ae performance score

70

Measured Metrics

name

value

score

weighting

FCP (First Contentful Paint)

Value4.1 s

21/100

10%

LCP (Largest Contentful Paint)

Value4.2 s

45/100

25%

SI (Speed Index)

Value4.3 s

76/100

10%

TBT (Total Blocking Time)

Value170 ms

93/100

30%

CLS (Cumulative Layout Shift)

Value0

100/100

15%

TTI (Time to Interactive)

Value6.1 s

63/100

10%

Network Requests Diagram

domaza.ae

363 ms

www.domaza.ae

1289 ms

rtl_screen.css

33 ms

66cbd9634b781d7740e35c31f8134c530f63d386.css

64 ms

loader.css

49 ms

Our browser made a total of 21 requests to load all elements on the main page. We found that 48% of them (10 requests) were addressed to the original Domaza.ae, 48% (10 requests) were made to Cdn.domaza.biz and 5% (1 request) were made to Googletagmanager.com. The less responsive or slowest element that took the longest time to load (1.3 sec) belongs to the original domain Domaza.ae.

Page Optimization Overview & Recommendations

Page size can be reduced by 394.0 kB (50%)

Content Size

782.4 kB

After Optimization

388.3 kB

In fact, the total size of Domaza.ae main page is 782.4 kB. This result falls beyond the top 1M of websites and identifies a large and not optimized web page that may take ages to load. 20% of websites need less resources to load. HTML takes 407.1 kB which makes up the majority of the site volume.

HTML Optimization

-90%

Potential reduce by 368.0 kB

  • Original 407.1 kB
  • After minification 306.9 kB
  • After compression 39.1 kB

HTML content can be minified and compressed by a website’s server. The most efficient way is to compress content using GZIP which reduces data amount travelling through the network between server and browser. This page needs HTML code to be minified as it can gain 100.2 kB, which is 25% of the original size. It is highly recommended that content of this web page should be compressed using GZIP, as it can save up to 368.0 kB or 90% of the original size.

Image Optimization

-16%

Potential reduce by 25.2 kB

  • Original 162.2 kB
  • After minification 136.9 kB

Image size optimization can help to speed up a website loading time. The chart above shows the difference between the size before and after optimization. Obviously, Domaza needs image optimization as it can save up to 25.2 kB or 16% of the original volume. The most popular and efficient tools for JPEG and PNG image optimization are Jpegoptim and PNG Crush.

JavaScript Optimization

-0%

Potential reduce by 0 B

  • Original 112.1 kB
  • After minification 112.1 kB
  • After compression 112.1 kB

It’s better to minify JavaScript in order to improve website performance. The diagram shows the current total size of all JavaScript files against the prospective JavaScript size after its minification and compression. This website has mostly compressed JavaScripts.

CSS Optimization

-1%

Potential reduce by 764 B

  • Original 101.0 kB
  • After minification 101.0 kB
  • After compression 100.2 kB

CSS files minification is very important to reduce a web page rendering time. The faster CSS files can load, the earlier a page can be rendered. Domaza.ae has all CSS files already compressed.

Requests Breakdown

Number of requests can be reduced by 3 (16%)

Requests Now

19

After Optimization

16

The browser has sent 19 CSS, Javascripts, AJAX and image requests in order to completely render the main page of Domaza. We recommend that multiple CSS and JavaScript files should be merged into one by each type, as it can help reduce assets requests from 4 to 1 for CSS and as a result speed up the page load time.

Accessibility Review

domaza.ae accessibility score

70

Accessibility Issues

Contrast

These are opportunities to improve the legibility of your content.

Impact

Issue

High

Background and foreground colors do not have a sufficient contrast ratio.

Names and labels

These are opportunities to improve the semantics of the controls in your application. This may enhance the experience for users of assistive technology, like a screen reader.

Impact

Issue

High

Links do not have a discernible name

Best practices

These items highlight common accessibility best practices.

Impact

Issue

High

[user-scalable="no"] is used in the <meta name="viewport"> element or the [maximum-scale] attribute is less than 5.

Best Practices

domaza.ae best practices score

83

Areas of Improvement

Trust and Safety

Impact

Issue

High

Does not use HTTPS

Low

Ensure CSP is effective against XSS attacks

SEO Factors

domaza.ae SEO score

98

Search Engine Optimization Advices

Mobile Friendly

Make sure your pages are mobile friendly so users don’t have to pinch or zoom in order to read the content pages. [Learn more](https://developers.google.com/search/mobile-sites/).

Impact

Issue

High

Document uses legible font sizes

High

Tap targets are not sized appropriately

Language and Encoding

  • Language Detected

    AR

  • Language Claimed

    AR

  • Encoding

    UTF-8

Language claimed in HTML meta tag should match the language actually used on the web page. Otherwise Domaza.ae can be misinterpreted by Google and other search engines. Our service has detected that Arabic is used on the page, and it matches the claimed language. Our system also found out that Domaza.ae main page’s claimed encoding is utf-8. Use of this encoding format is the best practice as the main page visitors from all over the world won’t have any issues with symbol transcription.

Social Sharing Optimization

Open Graph data is detected on the main page of Domaza. This is the best way to make the web page social media friendly. Here is how it looks like on Facebook: